Source Manufacturer · GB Standards · Stock · FCL Export · Free Technical Support中文中文EnglishEnglish

Tailings Pond Closure Liner Project

Metal mine tailings pond closure · 2024-2025

Summary: Closure treatment liner per GB 39496-2020 and GB 50863-2013: textured HDPE with filament geotextile composite system on basin and dam slopes.
Tailings Pond Closure Liner Project site photo
Tailings Pond Closure Liner Project site photo

Project Data

Tailings Pond Closure Liner Project project file
TypeMetal mine tailings pond closure
Period2024-2025
Materials1.5 mm double-textured HDPE + 600 g/m2 filament geotextile
QuantityMembrane ~70,000 m2, geotextile ~68,000 m2
Welding & testingTextured membrane on slopes, double-seam welding + vacuum sampling

Key Points

  • Double-textured membrane on steeper slopes for interface friction
  • Seepage drainage layer with composite geonet at basin
  • Dam-shoulder anchor trench and flood diversion built in parallel

Contact

Project cooperation and bulk supply: +86 18162025999 (Mr. Wang).

工程采购 · 项目投标 · 工地选材 · 防渗改造

山东鸿跃环保工程有限公司(鸿跃环保):源头工厂、国标正品、现货充足、支持定制、免费技术指导、全国配送。先咨询、再选材、后下单。